Production complex for the production of industrial pumps
Investor : Grundfos d.o.o.
Location
Inđija
Design year
Phase 1 - 2011 Phase 2 - 2021
Year of performance
Area
54.680 m2
A production facility for the production of pumps was designed and built on the Investor’s plot in Inđija. The facility consists of a production part, an annexed administrative building with two floors, storage area and technical rooms. Within the administrative building there are offices, a canteen with a kitchen, wardrobes for workers and facilities for employees’ rest and leisure.
As part of Phase 2, a new building for the production of industrial pumps with warehouses and technical rooms is planned. Phase 2 after construction forms a connection with Phase 1 as a unique production complex. Phases 1 and 2 is a part of a total of three planned phases of the “Grundfos” complex.